Shopfloor

Throughput

Good output crossing a defined process boundary per unit of time.

State the product, time period and good-unit boundary with a throughput number. Starts, completed cycles and shipped accepted units are different counts. A local machine speed increase may not increase line throughput if another resource remains the constraint. The capacity guide shows a serial-line example.

See also: Bottleneck · Cycle time

Use the concept: Downtime log template · SMED changeover observation template · Takt time calculator

Share: X · LinkedIn · Facebook · Hacker News · Email

In depth