Site acceptance test (SAT)

An agreed test of installed equipment and interfaces under the site’s approved conditions.

SAT checks must be tied to project requirements and executed through controlled site procedures. Factory simulation is useful prior evidence but does not replace installed loop and interface checks. Keep safety validation distinct from a general control-system checklist. The acceptance worksheet records failures, retests and remaining gaps.

See also: Factory acceptance test (FAT) · Management of change (MOC)

Use the concept: PLC FAT & SAT checklist template · 4–20 mA loop scaling · Industrial automation fundamentals