Shopfloor

Internal setup

Changeover work that requires the equipment to be stopped.

Distinguish work that physically requires the stop from preparation that can be performed beforehand under an approved procedure. Moving a task externally must preserve isolation, validation and other required checks. Record concurrent tasks so labor minutes are not mistaken for elapsed downtime. The SMED sheet provides fields for this observation.

See also: External setup · SMED · Changeover

Use the concept: Cp, Cpk, Pp & Ppk calculator · Downtime log template · MTBF, MTTR & availability calculator

Share: X · LinkedIn · Facebook · Hacker News · Email

In depth